Welcome Home Boston – Phase II

Project Overview

Delta Wye Critical Solutions provided comprehensive mechanical, electrical, plumbing, and fire protection (MEP/FP) engineering design for five new residential developments in the Dorchester neighborhood of Boston, MA. This project supported affordable housing expansion, creating modern, safe, and energy-efficient multi-family residences.

The development includes:

  • Four buildings with three-unit residences
  • One building with six-unit residences
  • Full-scale MEP/FP system design to support multi-family living
Challenges & Objectives
  • Optimized Residential Infrastructure – Designing high-performance mechanical, electrical, plumbing, and fire protection systems to meet the needs of multi-unit housing.
  • Scalability & Energy Efficiency – Implementing sustainable, cost-effective solutions to improve long-term livability.
  • Code Compliance & Safety – Ensuring all MEP/FP systems met Boston’s strict building codes, fire safety regulations, and environmental standards.
  • Reliable Utility & Power Distribution – Developing smart electrical layouts tailored for multi-unit configurations.
Our Approach & Solutions
  • Mechanical & HVAC Design – Engineered efficient heating, ventilation, and air conditioning systems for year-round comfort.
  • Electrical Design – Developed optimized power distribution, lighting, and emergency circuits to enhance safety and functionality.
  • Plumbing Systems – Designed water supply, drainage, and sanitary solutions to support multi-family occupancy.
  • Fire Protection Design – Integrated fire alarm and suppression systems for maximum safety and compliance.
Key Results
  • Five Modern Multi-Family Developments – Designed safe, efficient, and regulation-compliant housing solutions.
  • Energy-Efficient & Sustainable Infrastructure – Delivered cost-conscious and environmentally responsible MEP/FP designs.
  • Enhanced Resident Safety & Comfort – Ensured fire protection, ventilation, and power systems met the highest standards.

This project showcases Delta Wye’s expertise in multi-family housing developments, delivering scalable, efficient, and fully compliant MEP/FP solutions.

Client

Welcome Home Boston - Phase II

Location

80 Selden St, 85 Selden St, 106 Selden St, 65 Ballou Ave, 71 Ballou Ave – Dorchester, MA

Services Provided

MEP/FP Engineering Design
80 Selden Street
106 Selden Street
77 Ballou Avenue